129668642053593750_0-Reporter Wang Jin following the previously announced recall of EMU after rectification and reform have been put into operation, CNR (601,299) covers announcement, Changchun Railway car company limited company and majority-owned subsidiaries of the company recently issued by the Ministry of railways Transportation Department received on long restore factory after the shares CRH380BL EMU quality improvement notice, consentLong shares of newly-built CRH380BL-factory acceptance of EMU recovery. On August 10, CNR had notices issued by the Ministry of railways Transportation Department received long shares of CRH380BL EMU on the notice of suspension of factory. Since the launching of Beijing-Shanghai high-speed train, found long shares of the company production CRH380BL of EMU dueAutomatic false positives caused train delays in protection systems, and occur more frequently than the company limited liability company wholly-owned subsidiary of Tangshan Railway Vehicle produced by the same model.����Company made to the MOR does not affect the long shares of the total annual contract delivery situations, a comprehensive system to analyze the reasons, on formulating rectification and reform measures. As of August 10 announcement release, long shares this year'sDelivery plan-CRH380BL there are still 17 column in EMU has not been delivered, covering the contract value is approximately 6.7 billion yuan. On August 12, CNR notice has been submitted to the Ministry of railways agreed to suspend long joint-stock company production of CRH380BL-EMU ex-factory basis, recall production company-owned subsidiary and was put into operation of CRH380BL EMU 54 columns, based on analysis of failure causes system
swtor power leveling, overhaul, ensuring the quality of sources, ensuring safe operation.����After passing the rectification and reverting users. CNR on November 16 announcement, according to the arrangement of railway operations
the old republic power leveling, the company's recall of CRH380BL-EMU has carried out serious rectification and reform, after verification, third party assessmentAssessment and expert review, confirmed that the rectification of qualified, put into operation since November 16.
No comments:
Post a Comment